2012 Projects

KCI Construction had a busy year in 2012.  Examples of some of the projects we worked on are outlined here.

Walled Lake School District

KCI Construction entrusted with a Parking lot expansion and American Disabilities Act compliance program at the Walled Lake Community Center.

005

Installation of Engineered Edge Drain.

007

KCI Construction's own On-Site Engineering provided on all projects.

010

Preparing Pre-Engineered structural supports and foundations for new installation of overhead canopy system.

IMAG0242

Constructing a new ADA entrance.

011

KCI Construction assisting local schools in complying with American Disabilities Act Program.


Oakland County's Andover Road Drainage and Re-Pavement in Bloomfield Hills

KCI Construction handled the re-pavement and drainage program on Andover Road in Bloomfield Hills,  providing complete underground installation and re-stabilization.

055 cropped

Installation and stabilization of deficient ground material.

061
058
IMAG0278

KCI Construction working with Bloomfield & O.C.R.C. in the re-stabilization of Andover Rd.

IMAG0281
1012
IMAG0253

Controlling underground water and correcting sub bases.


Oakland University's 2012 Pathways Program

KCI Constructions ongoing Pathways Program at Oakland University.

IMAG0272

First Industrial's Airport Park

KCI Construction partnered with Allied Construction on a multi year renovation project near Metro Airport.

IMAG0233

Installation of Heavy Duty loading ramps


Lincoln Park High School Sports Field

Improvements at Lincoln Park High School Sports Stadium, including Decorative Concrete Architectural Embellishments.

IMAG0285IMAG0289IMAG0286

© 2011, KCI Construction, Inc.