Projects

KCI is pleased to have been trusted with your project.  To us, trust is built on communication, and we strive to keep you informed of any information as your project progresses.

Below is a summary of current projects.  Click on the title of any project to be taken to the project detail page, where you can see the latest information.

2012 Projects

KCI Construction had a busy year in 2012.  Examples of some of the projects we worked on are outlined here.

Walled Lake School District

KCI Construction entrusted with a Parking lot expansion and American Disabilities Act compliance program at the Walled Lake Community Center.

005

Installation of Engineered Edge Drain.

007

KCI Construction's own On-Site Engineering provided on all projects.

010

Preparing Pre-Engineered structural supports and foundations for new installation of overhead canopy system.

IMAG0242

Constructing a new ADA entrance.

011

KCI Construction assisting local schools in complying with American Disabilities Act Program.


Oakland County's Andover Road Drainage and Re-Pavement in Bloomfield Hills

KCI Construction handled the re-pavement and drainage program on Andover Road in Bloomfield Hills,  providing complete underground installation and re-stabilization.

055 cropped

Installation and stabilization of deficient ground material.

061
058
IMAG0278

KCI Construction working with Bloomfield & O.C.R.C. in the re-stabilization of Andover Rd.

IMAG0281
1012
IMAG0253

Controlling underground water and correcting sub bases.


Oakland University's 2012 Pathways Program

KCI Constructions ongoing Pathways Program at Oakland University.

IMAG0272

First Industrial's Airport Park

KCI Construction partnered with Allied Construction on a multi year renovation project near Metro Airport.

IMAG0233

Installation of Heavy Duty loading ramps


Lincoln Park High School Sports Field

Improvements at Lincoln Park High School Sports Stadium, including Decorative Concrete Architectural Embellishments.

IMAG0285IMAG0289IMAG0286

Past Projects

Some examples of our work from past years.

Other Recent Work

097

Ramp/Sidewalk (Oakland University)

095
094

Catch Basin repair and Repaving of Parking Lot (Oakland University)

091
090
089

ADA approved Sidewalk and Pathway with Drainage work (Oakland University)

088
084
082

Site Overhaul including Asphalt Resurfacing, Concrete Sidewalks and Ramps, Earthwork and Underground (Walled Lake Central High School)



Southfield DDA Sidewalk Program

Replacement and Addition of sidewalks and ramps along North Park drive in the city of Southfield.

Coves of Canton

The Coves of Canton project is a multi year asphalt replacement project which began in late 2011 and is ongoing through 2013. 

Overview of project spanning three years.

Replacement of old asphalt driveways with new concrete drives, curb and gutter.

City of Berkley Parking

Griffith/Robina Municipal Parking lot replacement and streetscape. 

Project included the facilitation of overall parking and city street scape design, installation and removal.

City street scape required two toned colored stamped concrete.

Irrigated landscaped islands with new cast in-place walls.

Installation included new storm system connecting all down spouts.



© 2011, KCI Construction, Inc.